Dolphin Pile, Neuried-Ichenheim
The structure consists of two dolphin piles KP33 from the ship side and one dolphin pile KP23 from the shore side, which are rammed.
Location:
Neuried-Ichenheim, Germany
Project period:
2017
Client:
Emch+Berger GmbH
Services:
Assembly drawings, detailed drawings